Case Study: Installation of Temporary Trackway at Ice Rink, Battersea Power Station
Battersea Power Station is one of London's most iconic landmarks — and one of its most sensitive venues. When an operator required temporary trackway to support the installation and operation of a seasonal ice rink, protecting the surrounding grounds was a critical requirement.
The Challenge
Working at a landmark venue like Battersea Power Station comes with heightened expectations:
- The grounds had to be protected from damage caused by delivery vehicles and equipment
- The trackway needed to integrate seamlessly with the aesthetic of the venue
- Installation and removal had to be completed within tight windows to fit the venue's event schedule
- High public footfall during the rink's operation required safe, stable pedestrian routes

Our Solution
GT Trax supplied a combination of PowerTrax panels for vehicle access routes and pedestrian walkway panels for public-facing areas. The layout was carefully planned in advance with the venue's operations team to ensure complete coverage of high-traffic zones while minimising the visual impact on the space.
Installation was completed by our professional site crew ahead of the rink's opening, with the work finished on schedule and to the client's full satisfaction.

The Result
The ice rink operated successfully throughout its seasonal run, with no damage to the Battersea Power Station grounds. The trackway provided safe access for delivery vehicles throughout the setup period, and the pedestrian panels ensured visitors could move safely between the rink and surrounding areas.
This project is an excellent example of how GT Trax can support high-profile events in sensitive locations, delivering reliable ground protection without compromising on quality or aesthetics.
Contact us to discuss your event ground protection requirements.
